Skip Top Navigation

Construction Updates for Whatcom, Skagit and Island Counties

Last update: 8:45 a.m. Monday, Sept. 17

This information changes frequently. Please check back often. Travelers can also call 5-1-1 or follow @WSDOT_North on Twitter for real-time traffic and weather updates.

If a highway is not listed below, there are no scheduled lane closures at this time, although emergency lane closures may still occur.

| Whatcom County | Skagit County | Island County | Special Events |

Click here for construction and maintenance closures on I-5 from Blaine to Federal Way.

Fairhaven Area: Northwest Washington Resurfacing - #9193

Highway: SR 11    Region: Northwest    County: Skagit    Location: Milepost(s) 17.89 - 19.83
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties. This work is weather dependent and locations could change suddenly. Follow WSDOT North on Twitter for the latest on changes to work zones.
Project webpage
Work schedule:

  • Monday, Sept. 17  - Crews will close one lane of SR 11/Chuckanut Drive between Teddy Bear Cove and Fairhaven between 9 a.m. and 4 p.m. for highway preservation work. Work hours could shift based on weather and air temperature.

Lynden Area: Northwest Washington Resurfacing - #9193

Highway: SR 539    Region: Northwest    County: Whatcom    Location: Milepost(s) 12.57 - 14.61
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties.
Project webpage
Work schedule:

  • Sweeping and the final sealant layer of material was applied to this stretch on Wednesday, Aug. 29 and Thursday, Aug. 30.
  • TBA - Crews will close one lane of SR 539/Guide Meridian Road between Badger Road and H Street between 7 a.m. and 6 p.m. for striping work. Work hours could shift based on weather and air temperature.
Glacier Area: Hedrick Creek Fish Passage - #9042

Highway: SR 542    Region: Northwest    County: Whatcom    Location: Milepost(s) 32.00
Contact: Gabe Ng, Project Engineer, 360-788-7403
Description: WSDOT contractor crews are removing an old narrow culvert and replacing it with a new bridge on SR 542 near Glacier.
Project webpage
Work schedule:

  • Monday, Sept. 17, through Friday, Sept. 21 - Crews will work on the Hedrick Creek fish passage project at milepost 32 on SR 542 from 7:30 a.m. to 4:30 p.m. Crews could close one lane of Mount Baker Highway during this work and have flaggers alternate traffic through the open lane.
Mount Baker Highway: Northwest Washington Resurfacing - #9193

Highway: SR 542    Region: Northwest    County: Whatcom    Location: Milepost(s) 46.58 to 54.73
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties.
Project webpage
Work schedule:

  • Sweeping and the final sealant layer of material was applied to this stretch on Wednesday, Sept. 5 and Thursday, Sept. 6.
  • TBA - Crews will close one lane of SR 542/Mount Baker Highway between the Nooksack River and the Artist Point gate from 7 a.m. to 6 p.m. for striping work. Work hours could shift based on weather and air temperature.

Everson Area Utility Work

Highway: SR 544 Region: Northwest County: Whatcom Location: Milepost: 0-1.97
Contact: Andrea E. Petrich, communications, 360-757-5963
Description: Puget Sound Energy crews will perform utility work.
Work schedule:

  • Until further notice - Puget Sound Energy crews will close one lane of SR 544 from SR 539/Guide Meridian Road to Hannegan Road daily, including weekends, from 7 a.m. to 5 p.m. and brief holds to traffic in all directions could happen between 9 a.m. and 3 p.m. Crews will not work between 12 p.m. Friday, Aug. 31, and 12 p.m. Tuesday, Sept. 4.
Ferndale Area: SR 548/Grandview & Kickerville Road Intersection Improvements - #9218

Highway: SR 548    Region: Northwest    County: Whatcom    Location: Milepost(s) 4.93
Contact: Gabe Ng, Project Engineer, 360-788-7403
Description: WSDOT contractor crews from Tiger Construction will build a roundabout at the intersection of SR 548 and Grandview/Kickerville Roads to improve safety. This intersection is currently a 4-way-stop and will remain that way until the roundabout project begins.
Project webpage
Work schedule:

  • Monday, Sept. 17, to Friday, Sept. 21 - Crews will close one lane at the intersection of SR 548 and Kickerville Road daily from 7 a.m. to 4 p.m. for landscaping and project cleanup work. Flaggers will alternate traffic through the open lane.
Big Lake to Sedro-Woolley Area: Northwest Washington Resurfacing - #9193

Highway: SR 9     Region: Northwest     County: Skagit     Location: Milepost(s) 44.08 - 55.89
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties. This work is weather dependent and locations could change suddenly. Follow WSDOT North on Twitter for the latest on changes to work zones.
Project webpage
Work schedule:

  • Wednesday, Sept. 26, through Friday, Sept. 28 - Crews will close one lane of SR 9 from the south end of Big Lake, near When Pigs Fly Farm, to SR 538 in Big Rock from 7 a.m. to 6 p.m. for highway preservation work. Work hours and days could shift based on weather and air temperature.
Big Lake Area: Gribble Creek Fish Passage - #9167

Highway: SR 9    Region: Northwest    County: Skagit    Location: Milepost(s) 47.95 - 48.05
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews are improving fish habitat through Gribble Creek under SR 9 in the Lake McMurray area.
Project webpage
Work schedule:

  • Monday, Sept. 17, through Friday, Sept. 21 - Crews could alternate traffic through this area between 7 a.m. and 5 p.m. Monday through Friday during fish passage improvement work. Flaggers will alternate traffic through the open lane.
Clear Lake Area: Francis Road Intersection Improvements - #9219

Highway: SR 9    Region: Northwest    County: Skagit    Location: Milepost(s) 53.15 - 53.35
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from SRV Construction are building a roundabout at the intersection of SR 9 and Francis/Old Day Creek Roads to improve safety.
Project webpage
Work schedule:

  • Monday, Sept. 17, through Wednesday, Sept. 19 - Crews will close one lane of SR 9 at Francis Road daily from 7 a.m. to 4 p.m. for light installation. Flaggers will alternate traffic through the open lane.
Bow Area: Northwest Washington Resurfacing - #9193

Highway: SR 11     Region: Northwest     County: Skagit     Location: Milepost(s) 7.83 - 9.82
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties. This work is weather dependent and locations could change suddenly. Follow WSDOT North on Twitter for the latest on changes to work zones.
Project webpage
Work schedule:

  • TBA - Crews will close one lane of SR 11/Chuckanut Drive south of Oyster Dome from West Bow Hill Road to Oyster Creek Lane from 7 a.m. to 6 p.m. for striping. Work hours could shift based on weather and air temperature.
Anacortes Area: Sharpes Corner to Anacortes Ferry Terminal Paving & ADA Improvements - #9180

Highway: SR 20 Spur    Region: Northwest    County: Skagit    Location: Milepost(s) 47.90 - 50.94 and 51.90 - 55.00
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Lakeside Industries are improving pedestrian access at more than three dozen areas for people of all abilities and are paving two different sections of the SR 20 Spur through Anacortes.
Project webpage
Work schedule:

  • No lane closures are currently scheduled.
Skagit County Puget Sound Energy Utility Work

Highway: SR 20 Region: Northwest County: Skagit Location: Milepost(s) 42 to 116
Contact: Andrea Petrich, Communications, 360-757-5963
Description: Puget Sound Energy crews are performing utility work.
Work schedule:

  • Wednesday, Sept. 19, through Friday, Sept. 21 - PSE crews will close one lane of SR 20 from 9 a.m. to 2 p.m. in small stretches between Deception Pass Bridge and Newhalem for meter work. Flaggers will alternate traffic through the open lane.
  • Monday, Sept. 24 - PSE crews will close one lane of SR 20 from 9 a.m. to 2 p.m. in small stretches between Deception Pass Bridge and Newhalem for meter work. Flaggers will alternate traffic through the open lane.
Fidalgo Island - Waterline Work

Highway: SR 20 Region: Northwest County: Skagit Location: Milepost(s) 43.89
Contact: Andrea Petrich, Communications, 360-757-5963
Description: Anacortes Water District crews are performing waterline work.
Work schedule:

  • Monday, Sept. 17, through the morning of Wednesday, Sept. 19 - Anacortes Water District crews will close one lane of SR 20 nightly from 8 p.m. to 5 a.m. near Deception Road for waterline work. Flaggers will alternate traffic through the open lane.
Campbell Lake Area Puget Sound Energy Utility Work

Highway: SR 525 Region: Northwest County: Skagit Location: Milepost(s) 45.93 to 46.05
Contact: Andrea Petrich, Communications, 360-757-5963
Description: Puget Sound Energy crews are performing utility work.
Work schedule:

  • Thursday, Sept. 20, through the morning of Friday, Sept. 21 - PSE crews will close one lane of SR 20 from 8 p.m. to 5 a.m. near Campbell Lake Road, south of Howard's Corner, for utility work. Flaggers will alternate traffic through the open lane.
Anacortes Area: Sharpes Corner Area Intersection Improvements - #9177

Highway: SR 20    Region: Northwest    County: Skagit    Location: Milepost(s) 46.67 - 48.39
Contact: Gabe Ng, Project Engineer, 360-788-7403
Description: WSDOT contractor crews from Tapani Inc. are building a roundabout at the intersection of SR 20 and Miller/Gibralter Roads, and the SR 20 Spur (Sharpes Corner) to improve safety and efficiency.
Project webpage
Work Schedule:

  • Monday, Sept. 17, through Friday, Sept. 21 - Crews will close lanes nightly from 7 p.m. to 6 a.m. and daily from 9 a.m. to 3 p.m. near Sharpes and Howard's corners for striping, landscaping and signage work. Flaggers will help direct drivers through the open lanes.
Newhalem Area: Northwest Washington Resurfacing - #9193

Highway: SR 20     Region: Northwest     County: Skagit     Location: Milepost(s) 114.54 - 116.38
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties. This work is weather dependent and locations could change suddenly. Follow WSDOT North on Twitter for the latest on changes to work zones.
Project webpage
Work schedule:

  • Sweeping and the final sealant layer of material was applied to this stretch on Tuesday, Aug. 28.
  • Monday, Sept. 17- Crews will close one lane of SR 20/North Cascades Highway east of the Newhalem Visitor Center from 11 a.m. to 6 p.m. for striping work. Flaggers will alternate traffic through the open lane.

Lake McMurray Area: Puget Sound Energy Utility Work

Highway: SR 534    Region: Northwest    County: Skagit    Location: Milepost(s) 0.00 - 5.00
Contact: Andrea Petrich, Communications, 360-757-5963
Description: Puget Sound Energy crews are performing utility work.
Work schedule:

  • Monday, Sept. 17, through Friday, Sept. 21 - PSE crews will close one lane of SR 534 between SR 9 and I-5 from 9 a.m. to 3 p.m. for utility work. Flaggers will alternate traffic through the open lane.
 
Coupeville Area: Northwest Washington Resurfacing - #9193

Highway: SR 20    Region: Northwest     County: Island     Location: Milepost(s) 12.91 - 16.30
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: WSDOT contractor crews from Granite Construction are resurfacing nearly 40 miles of highway on seven different highways in four northwestern Washington counties. This work is weather dependent and locations could change suddenly. Follow WSDOT North on Twitter for the latest on changes to work zones.
Project webpage
Work schedule:

  • Tuesday, Sept. 18  - Crews will close one lane of SR 20 from the Coupeville Ferry Terminal to SR 525/East Race Road from 9 a.m. until 4 p.m. for highway preservation work. Parking along this stretch will also be closed and vehicles left in this area could be towed. Flaggers will alternate traffic through the open lane. Work hours and dates could shift based on weather and air temperature.

Northern Whidbey Island: SR 20 and Banta Road/Northgate Drive

Highway: SR 20 Region: Northwest County: Island Location: Milepost(s) 39.21
Contact: Shane Spahr, Project Engineer, 360-848-7103
Description: In 2019, WSDOT contractor crews will build a roundabout at SR 20 and Banta Road/Northgate Drive on Whidbey Island. In advance of roundabout construction, companies with utilities in this area will work to locate and move equipment.
Project webpage
Work schedule:

  • Wednesday, Sept. 19 - Crews will close the southbound right turn lane on SR 20 at Banta Road from 9 a.m. to 3 p.m. for potholing work. Crews, barrels and signage will help drivers get to their destination.
 

Bellingham Traverse