Weekly update of construction closures in Downtown Seattle and SODO

Last update: 2 p.m. Monday, Aug. 20

This webpage contains information about WSDOT construction projects affecting vehicle or pedestrian traffic through downtown Seattle and SODO. If a highway is not listed below, there are no scheduled lane closures at this time, although emergency lane closures may still occur.

This information changes frequently so please check back often. Travelers can also call 5-1-1 or monitor @WSDOT_Traffic on Twitter for real-time traffic and weather updates.

City street closure information: Check with the Seattle Department of Transportation or monitor @SDOTtraffic on Twitter.

| I-5 | I-90 | SR 99 | SR 513 | SR 520 | Traffic Impacts Calendar |

Express Lanes Schedule Changes

Highway: I-5    Region: Northwest    County: King    Location: Milepost(s) 165.29 - 172.43
Contact: Nicole Daniels, Communications, 206-440-4479
Description: WSDOT uses the I-5 express lanes to assist the flow of traffic during busy travel times. These lanes are scheduled to move in the direction that will relieve the most congestion from the transportation system.
Express lanes schedule
Work schedule:

  • Sunday, Aug. 19, to the morning of Friday, Aug. 24 - The 9th and Pike Street express ramp to I-5 will be closed from 9 p.m. to 4 a.m. nightly.
NB MLK Jr Way to NE Ravenna Br Pavement Repair - #8952

Highway: I-5    Region: Northwest    County: King    Location: Milepost(s) 157.44 - 170.28
Contact: Dave Lindberg, Project Engineer, 425-225-8725
Description: WSDOT contractor crews are replacing 37 expansion joints and large sections of concrete pavement on northbound I-5 between MLK Junior Way South/SR 900 in Tukwila and Northeast Ravenna Boulevard in Seattle.
Project webpage
Work schedule:

LANE CLOSURES

  • Monday, Aug. 20, to the morning of Tuesday, Aug. 21 – The three left lanes of northbound I-5 between The Ship Canal Bridge and Northeast Ravenna Boulevard will be closed from 9 p.m. to 5 a.m.
  • Monday, Aug. 20, to the morning of Tuesday, Aug. 21 – The three left lanes of northbound I-5 between Denny Way and SR 520 will be closed from 9 p.m. to 5 a.m.

RAMP CLOSURES

  • Monday, Aug. 20, to the morning of Tuesday, Aug. 21 - The University Street on-ramp to northbound I-5 will be closed from 9 p.m. to 5 a.m. nightly.
  • Monday, Aug. 20, to the morning of Tuesday, Aug. 21 - The Mercer Street on-ramp to northbound I-5 will be closed from 10 p.m. to 5 a.m. nightly.
  • Monday, Aug. 20, to the morning of Tuesday, Aug. 21 - The northbound I-5 off-ramp to Mercer Street will be closed from 11 p.m. to 5 a.m. nightly.
  • Monday, Aug. 20, to the morning of Friday, Aug. 24 - The Northeast Ravenna Boulevard on-ramp to southbound I-5 will be closed from 9 p.m. to 5 a.m. nightly.
  • Tuesday, Aug. 21, to the morning of Thursday, Aug. 23 - The westbound SR 520 on-ramp to northbound I-5 will be closed from 10 p.m. to 5 a.m. nightly.
  • Tuesday, Aug. 21, to the morning of Thursday, Aug. 23 - The northbound I-5 off ramp to Columbian Way will be closed from 9 p.m. to 5 a.m. nightly.
  • Wednesday, Aug. 22, to the morning of Friday, Aug. 24 - The northbound I-5 off ramp to the West Seattle Bridge will be closed from 9 p.m. to 4:30 a.m. nightly.
  • **HIGH IMPACT** Friday, Aug. 24, to the morning of Monday, Aug. 27 - The northbound I-5 off-ramp to Columbian Way will close at 9 p.m. Friday, Aug. 24, and reopen at 5 a.m. Monday, Aug. 27.
  • **HIGH IMPACT** Friday, Aug. 24, to the morning of Monday, Aug. 27 - The northbound I-5 off-ramp to the West Seattle Bridge will close at p.m. Friday, Aug. 24, and reopen at 5 a.m. Monday, Aug. 27.
  • **HIGH IMPACT** Friday, Aug. 24, to the morning of Monday, Aug. 27 - The northbound I-5 off-ramp to Seneca Street will close at 2 p.m. Friday, Aug. 24, and reopen at 5 a.m. Monday, Aug. 27.
SB S Lucile St to Spring St Pavement Repair & ADA - #9235

Highway: I-5    Region: Northwest    County: King    Location: Milepost(s) 161.68 - 165.62
Contact: Mike Askarian, Project Engineer, 206-768-5861
Description: WSDOT contractor crews are replacing broken concrete panels, grinding and repaving southbound I-5 and the collector/distributor between Spring Street and South Lucile Street in Seattle.
Project webpage
Work schedule:

  • Monday, Aug. 13, to the morning of Friday, Aug. 17 - Up to four lanes of southbound I-5 between the Bellevue/Dearborn I-90 interchange and Albro Place/Swift Avenue will be closed from 9 p.m. to 5 a.m. nightly. This work is weather dependent.
Sound Transit's East Link Extension - E130

Highway: I-5    RegionNorthwest    County: King    Location: Milepost(s) 164.00
Contact: Zack Ambrose, Sound Transit, 206-903-7176
Description: Sound Transit crews are constructing the East Link light rail extension from Seattle to Redmond.
Project webpage
Work schedule:

  • Sunday, Aug. 19, to the morning of Friday, Aug. 24 - Two lanes of southbound I-5 at I-90 will be closed from 9 p.m. to 4 a.m. nightly.
  • Sunday, Aug. 26, to the morning of Friday, Aug. 31 - Two lanes of southbound I-5 at I-90 will be closed from 9 p.m. to 4 a.m. nightly.
Express Lanes Entrances Electronic Sign Replacement

Highway: I-5    Region: Northwest    County: King    Location: Milepost(s) 165.39 - 172.61
Contact: Dave Lindberg, Project Engineer, 425-225-8725
Description: WSDOT contractor crews are replacing the sign structures and brackets, along with the electrical and fiber optic systems at seven entrances to the I-5 express lanes. A few of the sign structures will also be redesigned to create a better viewing angle.
Project webpage
Work schedule:

  • No lane or ramp closures are scheduled.
Ship Canal Bridge Deck Repair Work

Highway: I-5    Region: Northwest     County: King    Location: Milepost(s) 167.02 - 168.00
Contact: Nicole Daniels, Communications, 206-440-4479
Description: WSDOT maintenance crews are performing deck repair work on the I-5 Ship Canal Bridge in Downtown Seattle.
Work schedule:

  • No lane or ramp closures are scheduled.
S Cloverdale St to Duwamish River Paving & ADA Compliance - #9239

Highway: SR 99    Region: Northwest    County: King    Location: Milepost(s) 25.90 - 30.00
Contact: Aleta Borschowa, Project Engineer, 206-768-5601
Description: WSDOT contractor crews are repaving the roadway and replacing the ADA ramps between the sidewalk and the street at some locations, which will provide better sidewalk connections for people of all abilities
Project webpage
Work schedule:

  • Sunday, Aug. 19, to the morning of Friday, Aug. 24 - The intersection at SR 99 and South Holden Street will be controlled by a uniformed police officer from 8 p.m. to 5 a.m. nightly.
  • Sunday, Aug. 19, to the morning of Friday, Aug. 24 – One lane in both directions of SR 99 between South Director Street and East Marginal Way will be closed from 8 p.m. to 5 a.m. nightly.
Alaskan Way Viaduct Replacement Project

Highway: SR 99    RegionNorthwest    County: King    Location: Milepost(s) 30.36 - 32.86
Contact: Laura Newborn, Communications, 206-805-2871
Description: WSDOT contractor crews are building a new SR 99 tunnel through downtown Seattle.
Project webpage
Work schedule:

  • Tuesday, Aug. 21 – The bus lane on northbound SR 99 between Spokane Street and Atlantic Street will be closed from 9 a.m. to 3 p.m.
  • Friday, Aug. 24, to the afternoon of Saturday, Aug. 25 – The right lane of southbound SR 99 between Lander Street and Horton Street will be closed from 11:59 p.m. to 12 p.m.
  • **HIGH IMPACT** Friday, Aug. 24, to the morning of Monday, Aug. 27 – All lanes of northbound SR 99 between Spokane Street and Atlantic Street will be closed from 9 p.m. Friday, Aug. 24 to to 5 a.m. Monday, Aug. 27.

Roy St to N 145th St Paving & ADA Compliance - #9256

Highway: SR 99    Region: Northwest    County: King    Location: Milepost(s) 32.90 - 40.48
Contact: Mike Askarian, Project Engineer, 206-768-5861
Description: WSDOT construction crews are grinding and repaving 7.5 miles of SR 99/Aurora Avenue North between Roy Street and North 145th Street in Seattle. Dozens of pedestrian ramps will also be rebuilt.
Project webpage
Work schedule:

  • Monday, Aug. 20 - The right lane in each direction of SR 99 between Winona Street and North 77th Street will be closed from 9 a.m. to 3 p.m.
  • Tuesday, Aug. 21 - The right lane in each direction of SR 99 between North 80th Street and North 83rd Street will be closed from 9 a.m. to 3 p.m.
  • Thursday, Aug. 23 - The right lane in each direction of SR 99 between 90th Street and 95th Street will be closed from 9 a.m. to 3 p.m.
  • Friday, Aug. 24 - The right lane in each direction of SR 99 between 100th Street and 105th Street will be closed from 9 a.m. to 3 p.m.
Aurora Bridge Painting (Stage 2) - #9168

Highway: SR 99    Region: Northwest    County: King    Location: Milepost(s) 34.17 - 34.73
Contact: Dave Lindberg, Project Engineer, 425-225-8725
Description: WSDOT construction crews are cleaning and repainting the Aurora Bridge. Crews are also grinding and repaving the driving surface of the bridge, and repairing seven expansion joints.
Project webpage
Work schedule:

  • Monday, Aug. 20, to the morning of Friday, Aug. 24 – Traffic will be reduced to one lane in both directions of SR 99 between Bridge Way North and Ray Street from 9 p.m. to 5 a.m. nightly.
West Approach Bridge North - #8625

Highway: SR 513    Region: Northwest    County: King    Location: Milepost(s) 0.00
Contact: Steve Strand Project Engineer, 206-770-3565
Description: The West Approach Bridge North Project is the latest phase of construction of the SR 520 Bridge Replacement and HOV Program and will extend SR 520's three westbound lanes from the new floating bridge to the Montlake area in Seattle.
Project webpage
Work schedule:

  • No lane or ramp closures are scheduled.
West Approach Bridge North - #8625

Highway: SR 520    Region: Northwest    County: King    Location: Milepost(s) 0.88 – 3.04
Contact: Steve Strand, Project Engineer, 206-770-3565
Description: The West Approach Bridge North Project is the latest phase of construction of the SR 520 Bridge Replacement and HOV Program and will extend SR 520's three westbound lanes from the new floating bridge to the Montlake area in Seattle.
Project webpage
Work schedule:

  • No lane or ramp closures are scheduled.

Plan ahead by checking for major traffic impacts on all state highways.