US 2 - Eagle Falls Vic to Tye Creek - Resurfacing - Completed October 2017

Overview
WSDOT contractor crews resurfaced three segments of US 2 totaling almost 17 miles of roadway between Gold Bar and Skykomish. The project was a combination of chip sealing and repaving. Two segments totaling more than eight miles was chip sealed, while the other eight-mile segment received a new layer of asphalt.

How You Benefit
Cross GlyphImproves Safety
Removing cracks, potholes and wheel ruts reduces the chance for water to pool on the roadway, creating a safer and smoother ride for drivers.

Partnerships & Cooperation

Funding

Pre-Existing Funds (PEF) $3,280
CWA $1,125
Total $4,404