Hood Canal Bridge Area Traffic Alerts and Cameras

Traveler Notice

Know before you go
From 11:59 p.m. Saturday, Dec. 16, to 5 a.m. Sunday, Dec. 17, a slow-moving oversized load will be transported along a two-mile segment of both SR 104 and SR 3 in Kitsap County. The load will start at Salsbury Point Boat Launch (Wheeler Street Northeast) and travel on SR 104 to SR 3. The load will continue to Scenic Drive Northeast. During the two-mile journey, the oversized load will occupy both lanes of the highways, and travel at just 5 mph. Drivers are encouraged to avoid the area during this time.

Follow us on Twitter @wsdot_tacoma

Hood Canal Alerts

As of 12/13/2017 10:23 PM
Blocking Incidents
  • From 11:59 p.m. Saturday, Dec. 16, to 5 a.m. Sunday, Dec. 17, a slow-moving oversized load will be transported along a two-mile segment of SR 104 and SR 3. The load will start at Salsbury Point Boat Launch (Wheeler Street Northeast) and travel on SR 104 to SR 3. The load will continue to Scenic Drive Northeast. During the journey, the oversized load will occupy both lanes of the highways, and travel at just 5 mph. Drivers are encouraged to avoid the area during this time.
Construction Closures
  • None reported
Special Events
  • None reported
Hood Canal Bridge Mt Walker, SR-101@ 301.5 3 SR 104 - Climbing Hill East SR 104 - Climbing Hill West SR 104 - West of Hood Canal Bridge SR 104 - Wheeler St East SR 104 - Wheeler St West SR 3 - Big Valley Rd North SR 3 - Big Valley Rd South SR 3 - Bridge Way North SR 3 - Bridge Way South SR 3 - Christopherson SR 3 - Equestrian Dr North SR 3 - Equestrian Dr South SR 3 - Hard Rock Way North SR 3 - Hard Rock Way South SR 3 - Pioneer Hill Rd North SR 3 - Pioneer Hill Rd South SR 3 - Scenic Drive North SR 3 - Scenic Drive South SR 3 - South of Hood Canal Bridge SR 3 - Tytler Rd North SR 3 - Tytler Rd South

Scheduled Openings

As of 12/13/2017 10:23 PM

By law, WSDOT is required to open the Hood Canal Bridge drawspan to mariners within one hour’s notice, and motorists are advised to expect up to 60-minute delays with each opening. If no drawspan openings are listed immediately below, no non-military drawspan openings are scheduled.

Listed openings are for maintenance and commercial and pleasure craft only

Hood Canal Bridge

Updated: Wednesday December 13, 2017 10:20 PM

Surface Temp:
Air Temp:
24hr High/Low:
Pressure:
Elevation:
43ºF / 6ºC
45ºF / 7ºC
49ºF / 42ºF
N/A
0ft/0m
Humidity:
Dew Point:
Visibility:
Wind Speed:
Wind Dir:
86%
41ºF
N/A
N/A
N/A
Location: 47.86, -122.62
TONIGHT
Clear
THURSDAY
Partly Cloudy
THURSDAY NIGHT
Partly Cloudy
FRIDAY
Rain