Return to Map

MODERATE IMPACT
SR 503 Both Directions - Monday, Oct. 15 to Friday, Oct. 19: Travelers on both directions of SR 503, between Niemi Road and McCracken Road will be alternated through a single-lane with flaggers, daily, from 7 a.m. to 5 p.m., for utility pole transfers. Last Updated: 10/12/2018 2:07 PM More Info
From milepost 48 to milepost 53
MODERATE IMPACT
SR 503 Both Directions - Monday, Oct. 15 to Friday, Oct. 19: Travelers on both directions of SR 503, between Northeast Gabriel Road and Gerber McKee Road will be alternated through a single-lane, with flaggers and pilot car, daily, from 6 a.m. to 4:30 p.m., for brush and tree limb removal along SR 503.
Note: Travelers should expect delays of up to 20 minutes, throughout the work zone. Last Updated: 10/12/2018 2:00 PM More Info
From milepost 14 to milepost 23
MODERATE IMPACT
SR 503 Both Directions - Monday, Oct. 15 to the morning of Saturday, Oct. 20: Travelers on both directions of SR 503, between Northeast 87th Street and Northeast 95th Street will be shifted to a single-lane, nightly, from 8 p.m. to 5 a.m., for drainage replacement work.
Note: One lane in each direction will remain open.
Note: Pedestrians and cyclists should watch for advanced signage, and will be guided by traffic control to either the northbound or southbound side of the work zone, nightly, from 6 p.m. to 5 a.m. Last Updated: 10/12/2018 1:54 PM More Info
From milepost 1 to milepost 2
MODERATE IMPACT
SR 503 Both Directions - Monday, Oct. 15 to Friday, Oct. 19: Traffic on both directions of SR 503, between Northeast Caples Road and Northeast 154th Street, will be reduced to a single-lane, with flaggers, daily, from 6 a.m. to 6 p.m., for Construction of bus/truck pullout lanes.
Note: During Construction a single-lane on both directions of SR 503 will remain open through the work zone.
Note: All work is weather dependent. Last Updated: 10/12/2018 1:51 PM More Info
From milepost 4 to milepost 5