SR 290, Trent Avenue was resurfaced from the Mission Ave. "Y" to Sullivan road. In addition, the bridge decks on the Spokane River Bridges near Pines Road were repaired and the eastbound SR 290/UPRR bridge deck was repaired.
Economic Incentive
A smoother roadway and protection for the underlying highway structure makes a better experience for drivers with a reduced need for expensive repairs and patching.
Partnerships and cooperation
WSDOT worked with the City's of Spokane, Spokane Valley, and Millwood during the project.
Pre-Existing Funds (PEF) $4,146
Total $4,146
Beth Bousley, communications
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207
509-324-6015
Bouslea@wsdot.wa.gov