SR 99 - Cloverdale St & SR 509 - 112th St to Duwamish River - Paving & ADA - Complete January 2019

Overview

In summer 2018, contractor crews from Tucci & Sons Inc. repaved both directions of SR 99 between South Cloverdale Street and First Avenue South, and SR 509 between South 112th Street and the Duwamish River. In addition, crews replaced curb ramps at select locations along the highways to create better sidewalk connections for people of all abilities. 

How you benefit:

  • Safety: Eliminating ruts and cracks in the pavement will reduce the opportunity for water to collect on the roadway, which can reduce traction for vehicles. Reconstructed curb ramps create better sidewalk connections for people of all abilities. 
  • Economic/Preservation: Repaving these sections of SR 99 and SR 509 preserves the highway structure and reduces the need for costly emergency repairs.

Funding

The cost of this project was $6.59 million.

Contact

Northwest Region Communications
15700 Dayton Avenue North
Seattle, WA 98133
206-440-4697
nwpublicaffairs@wsdot.wa.gov

A map of the work area on SR 99 and SR 509 south of Seattle