US 195 - Bridge Deck Repairs - Complete September 2018

Project news

  • As of Mar. 26, 2018, construction was underway at 4 locations with 3 sets of temporary signals 24/7.
  • N.A. Degerstrom, Inc. of Spokane Valley, WA was the prime contractor with a construction bid of $2,075,571.

Needs & Benefits

The contractor repaired and resurfaced five bridges on US 195, between Steptoe and Plaza.  The work extended the service life of the structure and provides a smooth driving surface.

Timeline

The project was completed in September 2018.

Funding

Financial Data for PIN 619504F, 619506K, 619506L, 619506N, 619506O
Amount ($ in thousands)

Pre-Existing Funds (PEF) - $3,650
Total - $3,650

Contact

Mark Allen, project engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA  99207
509-324-6000

US 195-2018 Bridge Deck Repair project thumbnail map